News

Contact Us

  • Email:qdsw87@qdswsteel.cn
  • Address:Room 3109, Building 2, No. 39 Shiling Rd, Qingdao, China
  • Mobile:0086-18669803758
  • Tel:0086-18669803758

800 ㎥ chicken manure treatment project

Author:admin Time:2021-07-13

The manure treatment project of 5000 chicken farms adopts the CSTR treatment process. The anaerobic unit specification is 800 cubic meters, and double film biogas holder is 200 cubic meters. After the manure is filtered, tempered and heated, it is pumped into Biomass reaction in CSTR anaerobic reaction, ensuring proper TS (%), reaction temperature (℃), and pH (PH=6.8~7.0). Most organic matter is degraded under working conditions. In the process of organic matter degradation, a large amount of new energy-biogas can be produced. More than 55% of the biogas produced is methane gas. Therefore, the biogas can be used to generate electricity or burn boilers after treatment by purification equipment. The generated electric energy or heat can not only be used in industry In daily life, the waste heat generated by the equipment can also heat the anaerobic reactor to ensure that the anaerobic reactor can carry out biomass energy reaction within a suitable temperature range.


Contact Us

Add: Room 3109, Building 2, No. 39 Shiling Rd, Qingdao, China
Tel: 0086-18669803758
Mobile: 0086-18669803758
0.021933s